Grab crane renovation for Nobian

grab crane for Nobian

The project

The project concerns the renovation of a grab crane for Nobian, used to unload salt from vessels. The existing crane required thorough renovation, and various components needed to be revised or replaced.

Iv played a central role in the project by drafting a Request for Quotation (RFQ) document outlining Nobian’s requirements. Iv assisted in guiding the tender process and supervising and monitoring the execution of renovation works from start to finish.

The challenge

Defining an accurate scope and working with the client to determine which components needed to be upgraded or replaced was critical to this project. We advised on the feasibility of a complete renovation versus replacement, resulting in a cost-effective solution. In addition, Iv designed a temporary repair for the swing drive mechanism to safely bridge the period until the renovation could be carried out.

The impact

The renovation included the entire steel structure and revised gearboxes, contributing to sustainability and cost savings. The renovated crane was ready for operation in September 2021.

Curious about the possibilities for your project?

Jaco, managing director Consult, would be delighted to discuss this with you! Get in touch via +31 88 943 3100 or send a message.

Send Jaco a message
Jaco van der Schans