Decommissioning

From preperation to save removal

The removal of offshore structures demands careful preparation, accurate data and controlled execution. Safety, predictability and compliance with regulations are central throughout the process, particularly as corrosion, fatigue and changing environmental and regulatory requirements affect structural integrity and removal strategies.

As differences in structural condition, increasing weights and complexity, types of structures and regional regulations all influence how removal can be carried out, early integrity assessments, FEED studies and feasibility analyses form the foundation for a technically sound and safe removal strategy. High‑quality data, such as 3D scans, inspections and structural analyses, ensures predictable operations and determines whether a structure can be removed in a single lift or requires a phased approach.

Engineering aligned with execution

As a market leader in offshore decommissioning, Iv has delivered solutions for the removal of a significant number of platforms. Our multidisciplinary expertise, spanning structural, marine, mechanical, electrical and HSE disciplines, ensures that every project is supported from early studies through offshore supervision and return transport. We design and verify temporary reinforcements, lifting points, grillage and other crucial structures to safeguard integrity throughout each phase of removal. By aligning engineering, logistics and offshore execution seamlessly, we minimise risks, ensure controlled operations and ensure all activities comply with applicable regulations and project requirements, while applying reusable materials wherever possible.

Decommissioning a Gravity Base Structure (GBS)

After a collision with a tanker, the removal strategy for the Petrogas Halfweg platform had to be reassessed under significant time pressure. Iv conducted a FEED study to assess the structural integrity of the platform during removal and transport. Following the removal of the topside, the massive concrete Gravity Base Structure also had to be removed. A significant challenge, as there are no standard solutions or comparable cases to draw from. As the client engineer, Iv provides advise to reduce risks and ensure safe removal.

Find out more

Projects in this market

Over the years, we have built up an impressive track record of decommissioning projects.

View all projects in this market

Curious about the possibilities for your project?

Jaco, managing director Consult, would be delighted to discuss this with you! Get in touch via +31 88 943 3100 or send a message.

Send Jaco a message
Jaco van der Schans